Tema Projects

Bam Nuttals / Network Rail

Tema Group Projects Include:

Bam Nuttals / Network Rail

PROJECT: Parson Pedestrian Foot Bridge / disabled access in South Wales 65mtr span & 12 no ramp sections.

WHAT WE DID:

Tema protective coatings applied a Network Rail N1 Paint Specification also with a Bimagrip anti Slip flooring material. An increasing number of bridges and footbridges for the rail industry are now completely fabricated off site, where size permits. These are transported to our factories as a pre-fabricated structure for the coatings to be applied off site prior to being lifted into position on site. All work is undertaken under the supervision of an In-house ICORR / NACE Coating Inspectors to ensure Network Rail Paint Specification is achieved.

Tema Groups Facilities Include:

Read More From Tema Engineering

Bam Nuttals

PROJECT: Q6 Olympic park Road bridge refurbishment 60 x 4.5 mtr span WHAT WE DID: The Bridge section was dismantled and delivered to Tema Protective coatings In house painting facility, Tema

Read More »

Bam Nuttals / Network Rail

PROJECT: Parson Pedestrian Foot Bridge / disabled access in South Wales 65mtr span & 12 no ramp sections. WHAT WE DID: Tema protective coatings applied a Network Rail N1 Paint Specification

Read More »
Numbers

Client results

Completed operations programs
0 +
Realized return on fees
0 x

Tema were always ready and keen to help where needed, with commitment to completing the order as quickly as possible, and exceeding expectations.

PROJECT ENGINEER -
GLOBALLY RENOWNED EQUIPMENT MANUFACTURER
Rated 5 out of 5

Discuss Your Engineering Project

We help companies stay ahead in a rapidly changing world.