Tema Projects

Bam Nuttals

Tema Group Projects Include:

Bam Nuttals

PROJECT: Q6 Olympic park Road bridge refurbishment 60 x 4.5 mtr span

WHAT WE DID:

The Bridge section was dismantled and delivered to Tema Protective coatings In house painting facility, Tema was requested to carry out a Highways maintenance specification Item 115, Item 116 ITEM 168 to comply with the HAP1 Form. The bridge section and bridge deck beams was fully refurbished to a high standard , then transported to London Olympic park, where it was re-erected on site, Tema carried out site repairs to the structure and carried out a full paint system to all connection areas.

Tema Groups Facilities Include:

Read More From Tema Engineering

Bam Nuttals

PROJECT: Q6 Olympic park Road bridge refurbishment 60 x 4.5 mtr span WHAT WE DID: The Bridge section was dismantled and delivered to Tema Protective coatings In house painting facility, Tema

Read More »

Bam Nuttals / Network Rail

PROJECT: Parson Pedestrian Foot Bridge / disabled access in South Wales 65mtr span & 12 no ramp sections. WHAT WE DID: Tema protective coatings applied a Network Rail N1 Paint Specification

Read More »
Numbers

Client results

Completed operations programs
0 +
Realized return on fees
0 x

Tema were always ready and keen to help where needed, with commitment to completing the order as quickly as possible, and exceeding expectations.

PROJECT ENGINEER -
GLOBALLY RENOWNED EQUIPMENT MANUFACTURER
Rated 5 out of 5

Discuss Your Engineering Project

We help companies stay ahead in a rapidly changing world.