Tema Projects

Cameron / Statoil

Tema Group Projects Include:

Cameron / Statoil

PROJECT: Mariner Platform

WHAT WE DID:

Tema Protective coatings were involved with a turnkey project from its sister company Tema engineering who manufactured the skid bases and vessels and super duplex pipe work, We were involved with CBNI to carry out CPT tests on all systems in line with the Norsok M501 rev6  standards,

All operatives went through the training and application process to achieve the standard required by the Norsok specification and witnessed by CBNI inspectors.

Coatings systems used

Carbon steel skid base… System 2A

Super duplex vessels and pipe work system 6c

Galvanised Handrails and guards… System 6B

Tema Groups Facilities Include:

Read More From Tema Engineering

Bam Nuttals

PROJECT: Q6 Olympic park Road bridge refurbishment 60 x 4.5 mtr span WHAT WE DID: The Bridge section was dismantled and delivered to Tema Protective coatings In house painting facility, Tema

Read More »

Bam Nuttals / Network Rail

PROJECT: Parson Pedestrian Foot Bridge / disabled access in South Wales 65mtr span & 12 no ramp sections. WHAT WE DID: Tema protective coatings applied a Network Rail N1 Paint Specification

Read More »
Numbers

Client results

Completed operations programs
0 +
Realized return on fees
0 x

Tema were always ready and keen to help where needed, with commitment to completing the order as quickly as possible, and exceeding expectations.

PROJECT ENGINEER -
GLOBALLY RENOWNED EQUIPMENT MANUFACTURER
Rated 5 out of 5

Discuss Your Engineering Project

We help companies stay ahead in a rapidly changing world.